Problem (Example)
- Order was scheduled to start M-F at 5:00 pm
- The last order job must start at 12:00 am (have to wait)
Solution
You can define the beginning of the runtime to the specific start time if it is possible to measure the running time of the job.
Job (max. running time 1 hour)
<run_time begin="12:00" end="13:00"/>
Order
<run_time let_run="no" > <period single_start="17:00"/> </run_time>