Purpose
- Add error handling to a number of job nodes in a workflow.
- If one of the jobs in the "Retry" block fails, then the order is moved to the begin of the "Retry" block to repeat execution.
- The number of retries and the respective delays are configured with the Retry Instruction.
- If the maximum number of retries is reached and a job in the "Retry" block fails then the order is considered being failed.
Workflow
- Download example: pdwReTry.json
x
Overview
Content Tools